logo

Menu

Skip to content

Menu

  • Home
  • About
    • Services
    • History
    • Team
    • Awards
  • Projects
    • Urban
    • Shopping
    • Public Buildings
    • Mixed-use Developments
    • Offices
    • Hotels
    • Residential
    • Housing
    • Interiors
  • Status
    • Completed
    • Under Construction
    • Design Development
  • Contact
English
  • Български Български

lpgroup.bg

  • Mail
  • Instagram
  • LinkedIn
House 19
2011-2015 Completed Housing Sofia

House 19

Read more
ANIMA
2011-2015 Completed Residential Sofia

ANIMA

ANIMA residential building is located in one of the quickly developed districts of Sofia – Manastirski livadi. The plot for the project is elongated in east-west direction and is accessed from the street through its narrow west side. This predetermines the elongated building volume which follows the shape of the site. The building comprises of […]

Read more
International Center for Career Development
2011-2015 Completed Public Buildings Sofia

International Center for Career Development

The academic complex International Center for Career Development consists of two buildings, attached along the common boundary of two separate plots, linked both architecturally and functionally. The buildings include four above-ground and one underground floor. The west part is an Academic Building for students of bachelor, master and doctorate degree, while the east part hosts […]

Read more
GrafiX
2011-2015 Completed Mixed-use Developments Offices Sofia

GrafiX

The building is located in the new administrative and retail centre of Sofia, on one of the primary city speedways – Tsarigradsko Shosse Blvd. Public transportation stops are available at close range. The vehicular access is easy and unobscured, minutes from the city centre and the airport. All these factors allow the zone to serve […]

Read more
House 8 Interior
2011-2015 Completed Interiors Sofia

House 8 Interior

Read more
House 6 Interior
2011-2015 Completed Interiors Sofia

House 6 Interior

Read more
Gentle House 3 – Housing Development
2011-2015 Completed Housing Sofia

Gentle House 3 – Housing Development

The residential development includes four family houses in attached building composition. The main idea behind the master-planning and functional zoning of the development is that all houses have small individual transitional spaces (a small front court) on their street side to provide vehicular and pedestrian access and a larger inner space – a visually spacious […]

Read more
Housing Development – 9 Houses
2011-2015 Completed Housing Sofia

Housing Development – 9 Houses

Read more
You are here: Home » Project Year » 2011-2015

© 2019 Copyright, LP group

  • Mail
  • Instagram
  • LinkedIn